1. When disassembling and installing the engine, it should be placed smoothly to prevent dumping and injuring people. Pay attention to the safety of electricity and oil, and do not smoke in the disassembly and installation site.
2. Remove the oil pan shell and do not twist it. The Wuling B series engine uses an iron oil bottom shell, which is not easy to disassemble because there is glue on it when disassembling. Do not warp and deform at high temperature, otherwise oil will leak after installation. The best way: use special tools when disassembling. The bolts should be removed in order.
3. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
4. Do not warp and deform when disassembling the oil pan. The Wuling B series engine adopts an iron oil sup shell. Because there is glue on it when disassembly, it is not easy to disassemble. Do not warp and deform at high temperatures, otherwise oil will leak after installation. The best way: use special tools when disassembling. Bolts should be disassembled in order.
1. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil pan, and loosen the engine oil pan.
2. Remove the cylinder head cover, remove the camshaft, etc., to facilitate the removal of the cylinder head. Disassemble the cylinder head and gasket (disassemble the cylinder head bolts and nuts evenly from both ends to the middle. You can use a wooden hammer to gently knock around the cylinder head to loosen it, and it is not allowed to pry the cylinder head with a starter) after removing the cylinder head.
3. Disassembly and installation of the engine 1) Remove the cylinder head 13 fixing screw, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head.3) Remove the cylinder cushion and pay attention to the installation direction of the cylinder cushion. 4) Loosen the oil release screw of the oil span shell 20 and release the oil in the oil sump shell.
4. Remove the camshaft: After removing the crankshaft, you need to remove the camshaft. Cleaning engine parts: After removing all the parts of the engine, all parts need to be cleaned for the next repair or replacement.
5. Remove the engine piston connecting rod group and rotate the crankshaft so that the engine 4-cylinder piston is at the lower stop point. 7) Remove the fastening nut of the connecting rod of the 4 cylinders respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
6. Unplug the dual-temperature switch of the radiator and the connection plug of the electric fan. Remove the engine front cover and baffle. First, loosen the six nuts that fix the front cover plate and the left and right fixing bolts of the radiator, and then remove the front bumper.Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask.
Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump and oil pipe connector. ( 2) Remove the power cords and wires on the generator. Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
The steps for disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
Engine disassembly steps and methods: Step 1: Remove the intake and exhaust pipes and exhaust pipes of the cylinder head. Step 2: Remove the valve cover. Remove the locking nut of the rocker arm shaft bracket and take out the rocker arm and shaft together. Remove all the putts. And make a good order so that the original friction pair can be maintained during installation. Step 3: Remove the timing gear cover and gasket camshaft.
The specific disassembly steps are as follows: Method 1: Unplug the battery wiring when the ignition switch is turned off. Take out the battery. Pay attention to pull it out first and then take it off. Unstighten the fastening bolt of the battery bracket and remove the battery bracket. Place a collection plate under the engine. Unscrew the lid of the coolant storage tank.
Process 1: Remove electrical connectors, accessories and water pipes 1 Remove the fuel pump fuse. After the engine is turned off, start the engine and rotate the crankshaft for 10 seconds to release the fuel pressure in the fuel system.2 Disconnect the negative cable of the battery. Operation diagram: Remove the ignition coil ▼ Remove the accessories and electrical connectors.
Hello: Release the oil first. Disassemble the exterior accessories. Remove the timing and cylinder head parts, remove the connecting rod and piston. Disassemble the crankshaft.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover and the rocker arm shaft assembly on the front and rear cylinder heads;Remove the crankshaft ventilation pipe, remove the bar chamber cover; remove the putter.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively. (3) Use sharp-nosed pliers to remove the valve lever oil seal.
Place the engine vertically. Remove the fixing screw of the cylinder head. Note that the screws should be loosened from both ends to the middle, and the screws should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion. Loosen the oil release screw of the oil span shell and drain the oil in the oil span shell.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, remove the oil pipe connector of the oil pump; remove the power cord and remove the wires on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
The steps for disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft pipe ventilation pipe, and remove the boom chamber cover;Take off the putt.
Process 1: Remove electrical connectors, accessories and water pipes 1 Remove the fuel pump fuse. After the engine is turned off, start the engine and rotate the crankshaft for 10 seconds to release the fuel pressure in the fuel system. 2 Disconnect the negative cable of the battery. Operation diagram: Remove the ignition coil ▼ Remove the accessories and electrical connectors.
I. Remove the engine hood. Second, it must be disassembled when the engine is fully cooled to avoid deformation of the machine parts. Third, clean the coolant in the radiator and water cover, and clean the oil in the oil shell.
1. Place the engine vertically. Remove the fixing screw of the cylinder head. Note that the screws should be loosened from both ends to the middle, and the screws should be removed three times.Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion. Loosen the oil release screw of the oil span shell and drain the oil in the oil span shell.
2. Disassembly of engine fuselage components 1) Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
3. The process of removing the engine from the frame: (1) Release the water and engine oil in the water tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump. ( 2) Remove the power cord and the cable on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connecting bolts and pins, etc. Take down the water tank and frame.
4. The steps for disassembly and disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
5. Engine disassembly steps and methods: Step 1: Remove the intake and exhaust pipes and exhaust pipes of the cylinder head. Step 2: Remove the valve cover. Remove the locking nut of the rocker arm shaft bracket and take out the rocker arm and shaft together. Remove all the putts. And make a good order so that the original friction pair can be maintained during installation.
Trade intelligence for marine cargo-APP, download it now, new users will receive a novice gift pack.
1. When disassembling and installing the engine, it should be placed smoothly to prevent dumping and injuring people. Pay attention to the safety of electricity and oil, and do not smoke in the disassembly and installation site.
2. Remove the oil pan shell and do not twist it. The Wuling B series engine uses an iron oil bottom shell, which is not easy to disassemble because there is glue on it when disassembling. Do not warp and deform at high temperature, otherwise oil will leak after installation. The best way: use special tools when disassembling. The bolts should be removed in order.
3. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
4. Do not warp and deform when disassembling the oil pan. The Wuling B series engine adopts an iron oil sup shell. Because there is glue on it when disassembly, it is not easy to disassemble. Do not warp and deform at high temperatures, otherwise oil will leak after installation. The best way: use special tools when disassembling. Bolts should be disassembled in order.
1. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil pan, and loosen the engine oil pan.
2. Remove the cylinder head cover, remove the camshaft, etc., to facilitate the removal of the cylinder head. Disassemble the cylinder head and gasket (disassemble the cylinder head bolts and nuts evenly from both ends to the middle. You can use a wooden hammer to gently knock around the cylinder head to loosen it, and it is not allowed to pry the cylinder head with a starter) after removing the cylinder head.
3. Disassembly and installation of the engine 1) Remove the cylinder head 13 fixing screw, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head.3) Remove the cylinder cushion and pay attention to the installation direction of the cylinder cushion. 4) Loosen the oil release screw of the oil span shell 20 and release the oil in the oil sump shell.
4. Remove the camshaft: After removing the crankshaft, you need to remove the camshaft. Cleaning engine parts: After removing all the parts of the engine, all parts need to be cleaned for the next repair or replacement.
5. Remove the engine piston connecting rod group and rotate the crankshaft so that the engine 4-cylinder piston is at the lower stop point. 7) Remove the fastening nut of the connecting rod of the 4 cylinders respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
6. Unplug the dual-temperature switch of the radiator and the connection plug of the electric fan. Remove the engine front cover and baffle. First, loosen the six nuts that fix the front cover plate and the left and right fixing bolts of the radiator, and then remove the front bumper.Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask.
Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump and oil pipe connector. ( 2) Remove the power cords and wires on the generator. Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
The steps for disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
Engine disassembly steps and methods: Step 1: Remove the intake and exhaust pipes and exhaust pipes of the cylinder head. Step 2: Remove the valve cover. Remove the locking nut of the rocker arm shaft bracket and take out the rocker arm and shaft together. Remove all the putts. And make a good order so that the original friction pair can be maintained during installation. Step 3: Remove the timing gear cover and gasket camshaft.
The specific disassembly steps are as follows: Method 1: Unplug the battery wiring when the ignition switch is turned off. Take out the battery. Pay attention to pull it out first and then take it off. Unstighten the fastening bolt of the battery bracket and remove the battery bracket. Place a collection plate under the engine. Unscrew the lid of the coolant storage tank.
Process 1: Remove electrical connectors, accessories and water pipes 1 Remove the fuel pump fuse. After the engine is turned off, start the engine and rotate the crankshaft for 10 seconds to release the fuel pressure in the fuel system.2 Disconnect the negative cable of the battery. Operation diagram: Remove the ignition coil ▼ Remove the accessories and electrical connectors.
Hello: Release the oil first. Disassemble the exterior accessories. Remove the timing and cylinder head parts, remove the connecting rod and piston. Disassemble the crankshaft.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover and the rocker arm shaft assembly on the front and rear cylinder heads;Remove the crankshaft ventilation pipe, remove the bar chamber cover; remove the putter.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively. (3) Use sharp-nosed pliers to remove the valve lever oil seal.
Place the engine vertically. Remove the fixing screw of the cylinder head. Note that the screws should be loosened from both ends to the middle, and the screws should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion. Loosen the oil release screw of the oil span shell and drain the oil in the oil span shell.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, remove the oil pipe connector of the oil pump; remove the power cord and remove the wires on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
The steps for disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft pipe ventilation pipe, and remove the boom chamber cover;Take off the putt.
Process 1: Remove electrical connectors, accessories and water pipes 1 Remove the fuel pump fuse. After the engine is turned off, start the engine and rotate the crankshaft for 10 seconds to release the fuel pressure in the fuel system. 2 Disconnect the negative cable of the battery. Operation diagram: Remove the ignition coil ▼ Remove the accessories and electrical connectors.
I. Remove the engine hood. Second, it must be disassembled when the engine is fully cooled to avoid deformation of the machine parts. Third, clean the coolant in the radiator and water cover, and clean the oil in the oil shell.
1. Place the engine vertically. Remove the fixing screw of the cylinder head. Note that the screws should be loosened from both ends to the middle, and the screws should be removed three times.Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion. Loosen the oil release screw of the oil span shell and drain the oil in the oil span shell.
2. Disassembly of engine fuselage components 1) Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed in 3 times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
3. The process of removing the engine from the frame: (1) Release the water and engine oil in the water tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump. ( 2) Remove the power cord and the cable on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connecting bolts and pins, etc. Take down the water tank and frame.
4. The steps for disassembly and disassembly of the engine are as follows: place the engine upright. Remove the intake and exhaust manifolds and the cylinder head outlet pipes. Remove the cylinder head cover. Remove the rocker arm assembly on the cylinder head, remove the boom chamber cover, remove the putter, and take out the boom in order. At the same time, write the sequence number. Remove the cylinder head and gasket.
5. Engine disassembly steps and methods: Step 1: Remove the intake and exhaust pipes and exhaust pipes of the cylinder head. Step 2: Remove the valve cover. Remove the locking nut of the rocker arm shaft bracket and take out the rocker arm and shaft together. Remove all the putts. And make a good order so that the original friction pair can be maintained during installation.
Data-driven multimodal transport decisions
author: 2024-12-23 21:43How to track compliance breaches
author: 2024-12-23 21:27Industrial cleaning supplies HS code checks
author: 2024-12-23 21:16How to interpret bill of lading data
author: 2024-12-23 20:45HS code-driven procurement strategies
author: 2024-12-23 20:11How to interpret global trade indices
author: 2024-12-23 21:56How to reduce customs compliance risk
author: 2024-12-23 20:33HS code-focused compliance audits
author: 2024-12-23 20:14853.78MB
Check991.62MB
Check849.17MB
Check974.52MB
Check413.95MB
Check447.55MB
Check631.43MB
Check721.23MB
Check686.32MB
Check494.96MB
Check287.26MB
Check382.28MB
Check341.75MB
Check186.23MB
Check262.46MB
Check246.83MB
Check622.14MB
Check832.68MB
Check382.66MB
Check944.55MB
Check182.46MB
Check144.83MB
Check871.64MB
Check362.76MB
Check485.43MB
Check493.28MB
Check283.39MB
Check354.89MB
Check557.32MB
Check269.88MB
Check415.34MB
Check155.73MB
Check134.43MB
Check925.43MB
Check321.86MB
Check561.52MB
CheckScan to install
Trade intelligence for marine cargo to discover more
Netizen comments More
1192 HS code-based cargo insurance optimization
2024-12-23 22:42 recommend
154 Industrial equipment HS code alignment
2024-12-23 21:51 recommend
58 Gourmet foods HS code classification
2024-12-23 21:41 recommend
616 Real-time HS code tariff updates for ASEAN
2024-12-23 20:25 recommend
321 Pharmaceutical imports by HS code
2024-12-23 20:10 recommend